Fee Schedules

(Right Click on this page to download or print).


FLAT RATE PROJECT PERMITS 
 

(Projects that are not associated with New Construction/Addition/Remodel)

Deck Permit - $150.00 (plus Plan Review, Aerial Imaging and Erosion Control fees)

Fence Permit - $75.00

Residential Yard Shed - $75.00 (plus Zoning, Aerial Imaging and Erosion Control fees)

Permanent Swimming Pool Permit - $150.00 all inclusive

Roof Replacement Permit (One & Two Family) - $75.00

Roof Replacement Permit (All Other) - $150.00

Siding/Soffit/Fascia Permit (One & Two Family) - $75.00

Siding/Soffit/Fascia Permit (All Other) - $150.00

Windows/Doors Permit (One a& Two Family) - $75.00

Windows/Doors Permit (All Other) - $150.00

Water Heater Permit (One & Two Family) - $75.00 per unit

Water Heater Permit (All Other) - $150.00 per unit

Water Treatment Device Permit (One & Two Family) - $75.00 per unit

Water Treatment Device Permit (All Other) - $150.00 per unit

Residential Furnace Permit - $75.00

Residential A/C Permit - $75.00 plus $75.00 electric if new installation

Commercial HVAC Equipment - $150.00 per unit

Residential Electrical Service Permit - $75

Moving or Demolition Permit - $75.00 per building

Sign Permit - $50.00 plus $1.00 per square of sign area

Minimum Permit Fee (One & Two Family) - $75.00

Minimum Permit Fee ( All Other) - $150.00
 Special Inspections - $50.00 per half-hour
 Misc. Fire Sprinkler or Fire Alarm System Permits not listed below - $100
 

 

New Construction/Addition/Alteration Building Groups

Group 1 - All residential buildings, single family, two-family and multifamily dwellings, and residential garages. (This group does not include hotels, motels or institutional buildings).
Note:  Certain projects within group 1 have set permit fees.  Please see Miscellaneous Permit Fees.


Group 2- General and professional offices, barber shops, beauty parlors, bowling alleys, dry-cleaning establishments, clinics, natatoriums, shelters, hotels and motels, taverns, restaurants, cafeterias, retail establishments, commercial garages, service stations, churches, assembly halls, theaters, exhibition buildings, educational institutions, hospitals, nursing homes, places of detention, gymnasiums, arenas, laboratories, lodge halls, funeral homes, libraries, skating rinks, dance halls, and armories.


Group 3 - Warehouses, freight terminals, storage buildings, refrigeration storage, factories, machine shops, electric sub-stations, sewage treatment plants, heating plants, steam & electric generating plants, transformer vaults and other building not classified in Groups I or 2.


All areas*- Areas included for fee calculation purposes shall include all floor levels, basement, attached garages, decks, porches, and all spaces enclosed and under roof. All area shall be the area associated with the particular project.

 


 NEW CONSTRUCTION AND ADDITION PERMITS


Building Fees
 Building permit fees shall be the sum of:
 Base Fee (One & Two Family) - $75.00 or

Base Fee (All Other) - $150.00 plus:
 Fee Determined by Building Group and Size
 Group 1 $.09 per square foot of all areas*
 Group 2 $.14 per square foot of all areas*
 Group 3 $.06 per square foot of all areas*
 
Electrical Fees
 Electrical permit fees shall be the sum of:
 Base Fee (One & Two Family) - $75.00 or

Base Fee (All Other) - $150.00 plus:
 Fee Determined by Building Group and Size
 Group 1 $.06 per square foot of all areas*
 Group 2 $.07 per square foot of all areas*
 Group 3 $.06 per square foot of all areas*
 

Plumbing Fees
 Plumbing permit fees shall be the sum of:
 Base Fee (One & Two Family) - $75.00 or

Base Fee (All Other) - $150.00 plus:

Fee Determined by Building Group and Size
 Group 1 $.06 per square foot of all areas*
 Group 2 $.07 per square foot of all areas*
 Group 3 $.06 per square foot of all areas*
 

Heating/Ventilating/Air Conditioning Fees
 Heating/Ventilating/Air Conditioning permit fees shall be the sum of:
 Base Fee (One & Two Family) - $75.00 or

Base Fee (All Other) - $150.00 plus:

Fee Determined by Building Group and Size
 Group 1 $.06 per square foot of all areas*
 Group 2 $.07 per square foot of all areas*
 Group 3 $.06 per square foot of all areas*


Fire Sprinkler System Fees
 Fire Sprinkler System permit fees shall be the sum of:
 Base Fee - $50, plus:
 Fee Determined by Building Group and Size
 Group 1 $.02 per square foot of all areas*
 Group 2 $.03 per square foot of all areas*
 Group 3 $.01 per square foot of all areas*
 Kitchen Hood Suppression Systems are a flat fee of $100 per unit.
 
Fire Alarm System Fees
 Fire Alarm System permit fees shall be the sum of:
 Base Fee - $50, plus:
 Fee Determined by Building Group and Size
 Group 1 $.02 per square foot of all areas*
 Group 2 $.03 per square foot of all areas*
 Group 3 $.01 per square foot of all areas*
 Kitchen Hood Suppression Systems are a flat fee of $100 per unit.
 


 ALTERATION AND REPAIR PERMITS


Building Fees
 Building permit fees shall be the greater of:
 Base Fee (One & Two Family) - $75.00 or

Base Fee (All Other) - $150.00 or:
 Fee Determined by Building Group and Size
 Group 1 $.09 per square foot of all areas*
 Group 2 $.14 per square foot of all areas*
 Group 3 $.06 per square foot of all areas*
 
Electrical Fees
 Electrical permit fees shall be the greater of:
 Base Fee (One & Two Family) - $75.00 or

Base Fee (All Other) - $150.00 or:

Fee Determined by Building Group and Size
 Group 1 $.06 per square foot of all areas*
 Group 2 $.07 per square foot of all areas*
 Group 3 $.06 per square foot of all areas*


Plumbing Fees
 Plumbing permit fees shall be the greater of:
 Base Fee (One & Two Family) - $75.00 or

Base Fee (All Other) - $150.00 or:
 Fee Determined by Building Group and Size
 Group 1 $.06 per square foot of all areas*
 Group 2 $.07 per square foot of all areas*
 Group 3 $.06 per square foot of all areas*
 

Heating/Ventilating/Air Conditioning Fees
 Heating/Ventilating/Air Conditioning permit fees shall be the greater of:
 Base Fee (One & Two Family) - $75.00 or

Base Fee (All Other) - $150.00 or:
 Fee Determined by Building Group and Size
 Group 1 $.06 per square foot of all areas*
 Group 2 $.07 per square foot of all areas*
 Group 3 $.06 per square foot of all areas*


Fire Sprinkler System Fees
 Fire Sprinkler System permit fees shall be the greater of:
 Base Fee - $50, or:
 Fee Determined by Building Group and Size
 Group 1 $.02 per square foot of all areas*
 Group 2 $.03 per square foot of all areas*
 Group 3 $.01 per square foot of all areas*
 Kitchen Hood Suppression Systems are a flat fee of $100 per unit.
 
 
Fire Alarm System Fees
 Fire Alarm System permit fees shall be the greater of:
 Base Fee - $50, or:
 Fee Determined by Building Group and Size
 Group 1 $.02 per square foot of all areas*
 Group 2 $.03 per square foot of all areas*
 Group 3 $.01 per square foot of all areas*
 Kitchen Hood Suppression Systems are a flat fee of $100 per unit.
 
 
MISCELLANEOUS FEES


 Exterior Sanitary, Water, and Stormwater Systems
 $50.00 per 100 lineal foot of pipe.
 
Erosion Control Fees (any land disturbance)
 -Accessory Structures and Additions up to one acre - $0.02 per square foot of building footprint
 -Group 1 New Construction up to one acre - $170 plus $0.02 per square foot of building footprint
 -Group 1 one acre or more, Group 2 and Group 3 - charged through Engineering Department


Early Start Permit - Group 1 $150.00

                                   Group 2 & 3 $225.00

Driveway Opening - $25.00


Wisconsin State Seal - $33.00


Certificate of Occupancy - $50.00 per unit


Delinquent Permit Penalty - A penalty equal to the amount of the permit fee at the time of application shall be assessed whenever the required permit is not obtained prior to commencing work.


 Misc. or extraordinary administrative or field inspection services - $50.00 per half hour
 


IMPACT, DEVELOPMENT OR OTHER FEES CHARGED AT TIME OF PERMITTING
 
Aerial Imagery Fee (Anything creating a new building footprint)
 
$0.03 per square foot of building footprint
 
Street Tree Fee (New construction only)
 
Residential per dwelling unit $325.00
 Commercial per fifty feet of street frontage $325.00
 
Park Development or Park Impact Fee (Group 1 new construction only)
 Varies by project & location
 
Sanitary Sewer Connection Fee
 Varies by project & location
 
Sanitary Main Interceptor Improvement Fee
 Varies by project & location
 
Traffic Impact Fee
 Varies by project & location

 

Refuse and Recycling Carts

$60.00 per cart

 


STATUTORY FEE REPORTS
To view the statutory housing reports required as part of 2017 Wisconsin Act 243, click here.